Synex International Inc. Homepage
Synex Energy Sigma Engineering About Synex Synex Energy News Releases Synex Energy Financials
SXI Corporate PresentationFact SheetLeave a Message

Water Resource Engineering

Project Experience

Columbia River - Flow Regime and Operations Review
- Department of Fisheries and OceansAnalysis of the hydrology of the Canadian portion of the Columbia River, including details of the operating regime under the Columbia River Treaty and Non-Treaty Storage Agreements.

Shuswap River Flow Availability
- BC Hydro

Modelling of Shuswap River flows and power production, to assess water availability for various flow release scenarios and to recommend revisions to the operation guidelines to improve fish habitat.

Premier Gold Project
- Boliden Westmin Ltd

Review of another consultants estimate of the PMF and calculation of a revised value of the PMF as part of the overall mine closure plan.

North Shore Vancouver
- Greater Vancouver Water District

Provision of a low flow return period analysis covering 3 basins and up to 70 years of data. Daily flows with and without primary and secondary storage were analyzed to determine the population support capacity of the system.

Review of the Snow Survey Program
- BC Ministry of Environment

A review of the current provincial snow survey program to determine its importance and efficiency was carried out which included extensive interviews, preparing questionnaires, analysis of responses, review of organizational structure, review of strategic plans and policies and analysis of operational activities.

Premier Mine, Stewart
- Westmin Resources Ltd

Hydrology and hydroelectric feasibility study for the Premier Gold Project. The studies required estimation of low flows and snowpack surveys.

North East Coal Development Area
- Teck Corporation

Hydrology studies to establish the major and minor drainage systems for the Bullmoose Mine, based on regional records and supervised flow monitoring programs.

Yukon Territory
- Territorial Government

Comprehensive study of hydro power potential covering regional analysis of available flow records to determine design flows and reservoir storage analysis for approximately 100 potential projects.

Stream Flow Gauging
- Various Locations

Design and installation of stream gauging and monitoring systems (including automatic rainfall recorders) for the District of Surrey, BC Hydro and several mining companies.

Edgewood, Fauquier, and Burton
- BC Hydro Properties Division

System reviews, recommendations and design of replacement works for 3 domestic water systems. Development, operation and administration of a residual chlorination monitoring program for the Fauquier and Burton domestic water systems.

Vancouver, British Columbia
- Pacific National Exhibition

Assessment of the fire flow capacity of the watermain system within the Pacific National Exhibition using the Waterworks modelling program, followed by design and construct services for improvements.

Iskut and Bella Coola
- Iskut Band Council and Bella Coola Band Council

Design and construction supervision of water improvements for a subdivision, including well pumping, storage tank and distribution system.

Maple Ridge - Pacific Marine Training Institute
- Firefighter Training School

Design of award winning effluent control and treatment system of fire fighting wastewater involving carbon filtration and ground disposal, with ongoing quality monitoring.

Christina Lake Assessment of Water Quality Data
- Ministry of Environment, Environmental Protection

Compilation and analysis of water quality data, water use information and potential water quality problems for Christina Lake, BC